I stopped by the beach at Nauset Light, in Eastham, to get an update on the repair of the stairs that were destroyed during the last big storm. Well, the stairs are almost completely repaired. Repaired isn't really the correct word here. The stairs were completely and totally rebuilt, top to bottom. The work was 99% completed, with just a few handrails needing to be finished. The new stairs are, actually, two complete staircases, with common landings. A work of art. Miraculously, the engineers figured out how to make the up-side shorter than the down-side (just kidding).
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment